ARKANSAS AIR NATIONAL GUARD: Rock trenched 669 feet and bored 263 feet, installed 932 feet of 2-way conduit, 1,863 feet of sub duct, 2 handholes and 2 ground rods. Slugged/Mandreled/Cleaned 5,415 feet of existing duct and placed 21,661 feet of innerduct, lashed 1,575 feet of standard tube cable, pulled 19,434 feet of SM/MM fiber. Installed 3,898 feet of FOC overhead. Terminated 700 strands of SM/MM fiber at both ends.


EARL CABELL FEDERAL BLDG: 157 CAT 5 and coaxial drops.


TEXAS NATURAL RESOURCE CONSERVATION COMMISSION: Cat 5e Voice and Data system. Placed 258 Cat 5e cables and riser cable at new location in Ft. Worth Texas.


BANK & ISLAND COMMUNITY BANK OF TEXAS: 69 drops, placed duct system and construct banking isle.


FIELDER ROAD BAPTIST CHURCH: 2000 feet fiber backbone, 1800 feet underground pathway, 120 Cat 5e cabling.



HCA HEALTHCARE: Cat 5 voice and data cabling in HCA Healthcare hospitals and Regional Service Centers. Job sizes range from 30 cables to 4000 cables, plus copper and fiber risers.

CITY OF DALLAS: Cat 5e voice and data cabling in existing City of Dallas facilities for VOIP project. Job sizes range from scalable to 300+ cables plus fiber risers

PACTIV: Provided and installed approximately 5000 ft of 50 pair CAT3, approximately 195,000 ft of Cat5e, 10,400 ft of 12 strand fiber cable. Install 160-Lucent SC, singlemode Type II connectors - 20 RF access points, terminating 4 of the 6 fibers on each end.


CITY OF MANSFIELD: Cat 6 voice and data cabling New City of Mansfield Recreation Center, Library, and City Hall. Jobs range from 42 to 396 Cat6 cables.


MARTIN SPROCKET & GEAR: Cat 5e and fiber cabling for voice and data at Detroit Facility and the Arlington Facility.


REAL FOUNDATIONS: Tested existing voice and data cabling, pulled additional cabling in new office location.


Email Questions